精品国产中文一级毛片在线看_成人亚洲日韩精品免费视频91蜜桃不卡_国产成人精品香港三级在线_少妇高潮惨叫喷水在线观看_亚洲а∨天堂手机bt网_无码少妇视频一区二区_城中村200元高素质太划算了_国产免费破外女真实出血视频gif_18 在线 播放 国产_香蕉视频免费网址

 

SZR系列熱礦篩

SZR系列熱礦振動(dòng)篩(熱礦篩)產(chǎn)品概述

    SZR系列熱礦振動(dòng)篩專供燒結(jié)廠完成熱燒結(jié)礦的分級(jí)和向冷卻設(shè)備均勻給料作業(yè),是我公司的重點(diǎn)產(chǎn)品之一。根據(jù)用戶的要求,我公司可承擔(dān)不同形式,不同規(guī)格的各種熱礦篩的設(shè)計(jì)制造。
Product overview
    
SZR series hot mining vibrating screen for sintering plant for hot sinter grade and cooling equipment uniform feeding operation, is one of the key products of my company.According to the user's requirements, our company can take different forms, different specifications of the design and manufacture of various kinds of hot griddle.

SZR系列熱礦振動(dòng)篩(熱礦篩)產(chǎn)品型號(hào)說明

Models Specification

      SZR □ □ 
        ┬  ┬ ┬  
        │  │ │
        │  │ └────────- 篩面長度dm
        │  └────────── 篩面寬度dm) 
        └──────────── 熱礦篩系列代號(hào)

SZR系列熱礦振動(dòng)篩(熱礦篩)工作原理和結(jié)構(gòu)特點(diǎn)

    SZR系列熱礦振動(dòng)篩為座式安裝,采用雙軸振動(dòng)器振動(dòng)。雙軸振動(dòng)器兩根軸由兩臺(tái)電動(dòng)機(jī)分別帶動(dòng)做反向自同步旋轉(zhuǎn),使篩箱產(chǎn)生直線振動(dòng)。電動(dòng)機(jī)安裝在篩箱側(cè)面的固定支架上,故電動(dòng)機(jī)不參振。電動(dòng)機(jī)和雙軸振動(dòng)器之間,兩臺(tái)雙軸振動(dòng)器之間均采用萬向聯(lián)軸器連接,萬向聯(lián)軸器同時(shí)具有角度和長度的補(bǔ)償作用,可以滿足篩機(jī)工作時(shí)電動(dòng)機(jī)和振動(dòng)器之間的相對(duì)位移要求。
    根據(jù)電動(dòng)機(jī)和振動(dòng)器安裝位置的不同,熱礦振動(dòng)篩可制定成上振式或下振式。SZR系列熱礦振動(dòng)篩均配備二次隔振系統(tǒng),對(duì)基礎(chǔ)的動(dòng)負(fù)荷較小,使用于有隔振減振要求,安裝高度允許的場合。
    熱礦篩篩箱的側(cè)板與橫梁采用優(yōu)質(zhì)耐熱不銹鋼(或優(yōu)質(zhì)耐熱鋼)制造,主受力板和側(cè)板的連接,側(cè)板和橫梁的連接采用環(huán)槽鉚釘鉚接,連接緊固可靠。
   熱礦振動(dòng)篩工作時(shí),篩板直接與高溫物料接觸,要求有較好的耐磨、耐熱性能,故采用耐熱合金鑄鋼。工作時(shí)篩板會(huì)受熱膨脹,篩板固定裝置采用斜插緊固,并設(shè)有熱補(bǔ)償機(jī)構(gòu),可保證工作溫度狀態(tài)下,篩板固定牢靠,篩板拆裝也比較方便。
Working principles and features
    SZR series hot mining vibrating screen is a type of installation, the biaxial vibrator vibration.Biaxial vibrator two axis respectively by two electric motors to drive do reverse self synchronous rotation, makes the screen box produce do linear vibration.Motor installed in the fixed bracket on the side of the screen box, so the motor is not concluded.Between the motor and biaxial vibrator, between two biaxial vibrator adopt universal shaft coupling, universal coupling with Angle and length of the compensation function at the same time, can meet the sieve machine work and the relative displacement between the vibrator motor.
    Depending on the position of the motor and the vibrator is installed, heat ore vibrating screen can be set into vibration type or under vibration pattern.SZR series hot mining vibrating screen are equipped with the secondary vibration isolation system, on the basis of the dynamic load is small, used in vibration isolation vibration reduction requirements, installation height allowed.
    Hot ore screen box side plate and beam is made of high quality heat-resistant stainless steel or high quality heat resistant steel manufacturing, the main force plate and side plate connection, side plate and beam connections using ring groove rivet, reliable connection fastening.
    Hot mining vibrating screen is working, sieve plate directly contact with high temperature materials, has good abrasion resistance, heat resistance, heat resistant alloy steel casting is adopted.Work sieve plate heat expansion, sieve plate fixation device adopts oblique clamp, and is equipped with thermal compensation mechanism, can guarantee the working temperature conditions, sieve plate fixation, sieve plate dismantling is convenient.

SZR系列熱礦振動(dòng)篩(熱礦篩)技術(shù)參數(shù)表

Parameters
型號(hào) 給料粒度(mm) 處理量(t/h) 振次(r/min) 雙振幅(mm) 電動(dòng)機(jī)型號(hào) 功率(Kw)
SZR-1545 ≤80 120 740 7-9 Y160L-8 2×7.5
SZR-1850 150 7-9 Y180L-8 2×11
SZR-2060 350 7-9 Y200L-8 2×15
SZR-2575 450 9 Y255M-8 2×22
SZR-3175 600 9 Y255M-8 2×22

SZR系列熱礦振動(dòng)篩(熱礦篩)使用條件

    1.為減少物料對(duì)篩板的沖擊,篩箱受料端的給料落差不大于500mm,其給料方向應(yīng)與篩面上物料運(yùn)動(dòng)方向一致。
    2.振動(dòng)器與篩面之間必須安裝隔熱裝置(隔熱水箱或隔熱板)以減少燒結(jié)礦的熱輻射對(duì)振動(dòng)器的影響,保證振動(dòng)器在允許的溫度下工作。
    3.物料溫度為500-1000℃,但篩框的允許溫度為300-500℃。故在篩面、返礦漏斗和橫梁內(nèi)壁必須抽風(fēng)或通風(fēng)冷卻。
    4.漏斗、抽風(fēng)罩和隔熱裝置均不得固定在篩子本體上,其與篩體振動(dòng)部分之間的間隙不得小于50mm.
Working condition
1. In order to reduce the material impact on sieve plate, screen box by feeding the feeding head is not more than 500 mm, the feeding direction shall conform to the screen material direction.
2. The device must be installed insulation between the vibrator and screen surface (heat insulation water tank or board) in order to reduce sinter of thermal radiation on the influence of the vibrator, guarantee the vibrator work under the allowed temperature.
3. The material is 500-1000 ℃ temperature, but the screen allows the temperature of 300-500 ℃.Therefore, on the inner wall of the sieve surface, the funnel and beams of must convulsions or ventilation cooling.
4. The funnel, convulsions cover and heat insulation device shall be fixed on the sieve ontology, the gap between vibration sieve body part and shall not be less than 50 mm.

SZR系列熱礦振動(dòng)篩(熱礦篩)的運(yùn)輸與保管

    篩子應(yīng)在水平情況下起吊,起吊后要保持篩子平衡。要用鋼絲繩套在篩框的起吊孔上起吊,不允許吊篩子的其它部位。篩子分為篩箱(包括振動(dòng)器)、隔振架、電動(dòng)機(jī)及電機(jī)架三部分運(yùn)輸。在工地現(xiàn)場拖拉運(yùn)輸時(shí),篩箱下部應(yīng)墊若干滾杠,地面要平整,鋼絲繩應(yīng)兜住篩框下部鋼度較大部位。設(shè)備到貨后,應(yīng)根據(jù)發(fā)貨清單檢查設(shè)備是否齊全,裝運(yùn)過程中是否造成損壞。存放地面平整,篩子應(yīng)有枕木墊起,不得與地面接觸,更不得被水浸泡。露天存放時(shí),上部應(yīng)遮蓋。
Transportation and storage
    
After the screen should be under the condition of horizontal lifting, the lifting to keep balance of sieve.To use wire rope on the lifting hole of sieve box set lifting, are not allowed to other parts of the crane sieve.Sieve is divided into screen box (including vibrator), vibration isolation frame, motor frame three parts transportation and electricity.Drag transportation at the site, the lower part of screen box should be several rollarounds pad, the ground should level off, the wire rope should take larger screen lower steel parts.After the arrival of the goods, the equipment should be according to the shipping list to check whether the equipment is complete, the shipment is damaged in the process.Storage ground level off, the sieve should be sleeper pads, can not contact with the ground, nor is soaked by water.In open air, upper part should be covered.

SZR系列熱礦振動(dòng)篩(熱礦篩)產(chǎn)品的安裝與試運(yùn)轉(zhuǎn)

    1.熱礦振動(dòng)篩的安裝基礎(chǔ)應(yīng)按總圖所示尺寸預(yù)埋安裝鋼板(鋼板厚度30mm)。鋼板下應(yīng)有梁支承,并將鋼板固定在梁上。各預(yù)埋鋼板的上面應(yīng)在同一水平面上,前后左右誤差不大于3mm。
    2.電機(jī)架的安裝基礎(chǔ)應(yīng)有梁支承,其水泥基礎(chǔ)待電機(jī)高度調(diào)整好后,在進(jìn)行二次澆灌。
    3.安裝基礎(chǔ)上用的鋼板和地腳螺栓均有安裝單位自行準(zhǔn)備,設(shè)備出廠時(shí)不附上述備件。
    4.裝完彈簧支座和電機(jī)架,調(diào)整相對(duì)位置,并初步固定后,順次裝上減振彈簧。彈簧裝入前,應(yīng)按端面標(biāo)記的實(shí)際鋼度值進(jìn)行選配,每臺(tái)篩機(jī)各支點(diǎn)的彈簧剛度應(yīng)一致,彈簧安裝后中心線與彈簧支座平面應(yīng)垂直。
    5.將隔振架安裝在彈簧上,然后將一次隔振彈簧安裝在隔振架上。
    6.將篩子吊起,使篩面傾角符合總圖要求,然后慢慢放下,座落在一次隔振彈簧上。
    7.篩子安裝后,應(yīng)保持篩箱和隔振架的橫向水平,可用水平尺在篩箱的進(jìn)出料端分別測量,若不水平,可調(diào)整彈簧支座的高度。
    8.電機(jī)架安裝時(shí),要求電動(dòng)機(jī)軸線和振動(dòng)器軸線在同一垂直平面上,考慮到篩面上有物料后支承彈簧的壓縮變形增加,電動(dòng)機(jī)軸線應(yīng)低于振動(dòng)器軸線3-5mm.
    9.安裝兩振動(dòng)器之間的中間聯(lián)軸器時(shí),應(yīng)嚴(yán)格按制造廠所做的標(biāo)記對(duì)聯(lián)接法蘭進(jìn)行安裝,保證兩振動(dòng)器偏心塊相對(duì)位置一致。
    10.振動(dòng)器出廠后,如時(shí)間超過6個(gè)月,安裝前須將振動(dòng)器各零件拆洗干凈,軸承和迷宮槽內(nèi)注入適量的2號(hào)工業(yè)鋰基脂。
    11.振動(dòng)器安裝完畢后,用手板動(dòng)偏心塊,若有阻力過大或卡死現(xiàn)象,必須找出原因加以調(diào)整。
    12.安裝完畢要檢查全部螺栓的緊固情況。
    13.空負(fù)荷試運(yùn)轉(zhuǎn)6-8小時(shí),試運(yùn)轉(zhuǎn)過程中觀察篩子運(yùn)行情況,要求振動(dòng)平衡,無橫向擺動(dòng)及不正常響聲。
    14.熱礦篩6-8小時(shí)試運(yùn)轉(zhuǎn)后,應(yīng)檢查振動(dòng)器軸承工作溫度,要求軸承最高溫度不超過75攝氏度,還應(yīng)檢查篩板和振動(dòng)器的緊固情況,發(fā)現(xiàn)松動(dòng)應(yīng)及時(shí)擰緊。
    15.第一次投產(chǎn)后,熱狀態(tài)工作6-8小時(shí)后,應(yīng)使篩箱冷卻至室溫,將篩板和振動(dòng)器的緊固螺栓再擰緊一次。
Installation and commissioning
1. Heat ore vibrating screen installation base should be installed according to the size of general layout is shown in embedded steel plate (30 mm) thickness of steel plate.Bearing steel plate under due beams, and steel plate fixed on the beam.Top of the embedded steel plate should be in the same horizontal plane, and the error is not more than 3 mm.
2. The installation of the electric machine frame foundation beam support, its concrete foundation after being good motor height adjustment, in the secondary water.
3. The installation based on the use of steel plate and the anchor bolts are installed units themselves preparation, equipment factory not attach the spare parts.
4. Complete the spring bearing and electrical rack, adjusting the relative position, and after preliminary fixed, progressive damping spring.Spring loaded before, should according to the actual stiffness value end tag by matching, spring stiffness of each sieve machine protection should be consistent, spring after the center line and the spring support should be perpendicular to the plane.
5. Install the spring vibration isolation frame, and then a vibration isolation spring installed in vibration isolation frame.
6. Add a sieve to lift, the screen surface inclination of conform to the requirements of the general layout, then slowly put down, is located on a vibration isolation spring.
7. A sieve is installed, should maintain screen box and vibration isolation frame transverse level, usable level measured in screen box front-rear end, if not, can adjust the height of spring support.
8. Electrical rack installation, requirements and vibrator motor axis axis in the same vertical plane, after considering the sieve surface material supporting spring compression deformation increases, the motor axis should be lower than vibrator axis 3-5 mm.
9. When installed in the middle of the coupling between two vibrator, should be in strict accordance with the manufacturer do mark on the connecting flange installation, ensure that two vibrator eccentric block relative position.
After 10. Vibrator, such as more than six months, before installation should be the vibrator unpick and wash clean all parts, bearings and labyrinth slot into the right amount of no. 2 industrial lithium base grease.
11. Vibrator after the installation, use hand moving eccentric block, if there is too much resistance or stuck phenomenon, must find out why.
12. Check all the installation bolt fastening.
13. Empty load test run six to eight hours, observe sieve operation commissioning process, vibration balancing, no lateral oscillation and abnormal noise.
14. Hot griddle six to eight hours after the commissioning, shall check the working temperature of vibrators bearing, bearing the highest temperature no more than 75 degrees Celsius, should also check the sieve plate and fastening situation of vibrator, found loose should tighten in time.
15. The first time, after the production of thermal state after six to eight hours work, makes the screen box should be cool to room temperature, the sieve plate and vibrator of the bolt to tighten again.

SZR系列熱礦振動(dòng)篩(熱礦篩)產(chǎn)品使用和維護(hù)

    1.操作人員操作前應(yīng)熟悉設(shè)備,進(jìn)行設(shè)備的總檢視,檢查各部位螺栓是否松動(dòng),篩面是否破損等。
    2.篩子啟動(dòng)應(yīng)遵循工藝系統(tǒng)順序,盡量避免帶料啟動(dòng),待篩子運(yùn)轉(zhuǎn)平穩(wěn)后才能給料。
    3.熱礦篩在工作過程中應(yīng)經(jīng)常觀察篩子運(yùn)行是否平穩(wěn),若發(fā)現(xiàn)運(yùn)動(dòng)不正;虍惓B曧憰r(shí),必須及時(shí)停機(jī)檢查,找出原因,排除故障。
    4.篩子停車應(yīng)符合工藝系統(tǒng)順序,除特殊事故外,禁止帶料停車或停車后繼續(xù)給料。篩子停車后,應(yīng)檢查螺栓是否松動(dòng),若發(fā)現(xiàn)有松動(dòng)應(yīng)及時(shí)擰緊。
    5.運(yùn)轉(zhuǎn)過程中如遇突然事故停機(jī)時(shí),必須繼續(xù)對(duì)篩面通風(fēng)冷卻,防止篩面上灼熱物料使篩箱過熱而變形。
    6.停車后應(yīng)清理篩面及篩子周圍環(huán)境。
    7.要重視振動(dòng)器與篩箱,篩板與篩箱聯(lián)接螺栓的緊固情況,若發(fā)現(xiàn)有松動(dòng)應(yīng)及時(shí)擰緊。
    8.篩框的側(cè)板和橫梁均采用優(yōu)質(zhì)耐熱不銹鋼制造,不允許在篩框上焊接其他東西,以免影響材料性能。
    9.篩板緊固機(jī)構(gòu)中的蝶形彈簧是作緊固件熱膨脹補(bǔ)償用的,失效的蝶形彈簧應(yīng)及時(shí)更換。
    10.篩板受灼熱物料直接接觸和磨損,故應(yīng)經(jīng)常檢查其工作情況,如發(fā)現(xiàn)篩板有裂痕,應(yīng)及時(shí)焊補(bǔ),以免裂痕擴(kuò)大而造成損壞。
    11.振動(dòng)篩在熱狀態(tài)時(shí),不許用冷水沖灑篩箱及篩板,防止因急劇冷卻而造成篩箱及篩板變形和開裂。
    12.螺旋彈簧內(nèi)積聚礦粉,會(huì)影響彈簧正常工作,應(yīng)經(jīng)常用壓縮空氣吹掃清理。
    13.振動(dòng)器軸承采用2號(hào)工業(yè)鋰基脂潤滑,正常情況下每周注油一次,油量不宜過多,以免引起軸承過熱。
    14.振動(dòng)器使用6個(gè)月后,應(yīng)檢查油指情況,如變干或有硬塊時(shí),應(yīng)及時(shí)清洗換脂。要求軸承每年清洗1-2次。
Use and maintenance
1. The operator should be familiar with the equipment before operation, do equipment total review, check each part bolt looseness, screen surface was damaged.
2. A sieve start should follow the order process system, try to avoid belt is expected to start, after waiting for sieve smooth operation to feed.
3. Hot mineral screen should be in the process of work often observe whether sieve running smoothly, that the movement is not normal or abnormal sound, it must immediately stop check, find out the reasons, troubleshooting.
4. Sieve parking should comply with the order process system, in addition to the special accident, has banned materials after parking or continue to feed.Sieve after parking, should check whether the bolt is loose, if found loose should tighten in time.
5. In the process of operation in case of sudden shutdown, must continue to screen surface ventilation cooling, prevent the screen makes the screen box overheating and burning material deformation.
6. After parking should be clear the screen surface and sieve the surrounding environment.
Attaches great importance to the vibrator and screen box, sieve plate and the connecting bolt fastening situation, if found loose should tighten in time.
8. Screen box side plates and beams are made of high quality heat-resistant stainless steel, are not allowed on the sieve box welding of other things, lest affect material properties.
9. Sieve plate fastening device of the butterfly spring is used as fasteners thermal expansion compensation, failure of the butterfly spring should be replaced in a timely manner.
10. Sieve plate hot material in direct contact and wear and tear, reason should be regularly check the work situation, such as found that cracks have appeared on sieve plate should be welding repair in time, lest damage cracks expand.
11. Vibrating screen in thermal state, not allowed to use cold water spilled screen box and sieve plate, to prevent the screen box caused by rapid cooling and sieve plate deformation and cracking.
12. Helical spring inside accumulate kuangfen, will affect the normal work of the spring, often should use compressed air purging cleaning.
13. Vibrators bearing adopts 2 industrial lithium base grease lubrication, oil once a week, normal oil is unfavorable and overmuch, lest cause bearing overheating.
14. Vibrator used after six months, should check the oil refers to the situation, such as dry or lump, should be timely cleaning in fat.For bearing cleaning 1 to 2 times a year.